Multi-Scope Construction
for Iconic Entertainment Venues
From new construction, expansions and improvements to existing entertainment structures, Joseph J. Albanese, Inc. helps create iconic stadiums where the public can enjoy professional sports, concerts and more.
“We are proud of the work we have done at these iconic entertainment venues that bring the community together.”
​
— Phillip Albanese, CEO & President, Joseph J. Albanese
At Joseph J. Albanese, Inc., we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted to bringing the highest level of quality to every project we do for our clients.
Earthquake Stadium
San Jose, California
Project: Expansion of field boxes
Services:
Demolition, concrete, expansion and reconfiguration of field boxes
Highlights:
-
The team worked around the team’s schedule while getting the job done safely and invisibly
-
We successfully and unobtrusively performed the scope of work at an actively functioning stadium
-
Working quickly and off-hours, the job was finished on time and on budget while accommodating design changes while the project was underway
“Working around a professional soccer stadium, we had the highest level of protection of in-place elements, and we did our work behind the scenes with no disruption to team activities.”
— Matt Maes, Project Executive, Joseph J. Albanese, Inc.
Levi's Stadium
​
Santa Clara, California
​
Project:
Phase 1 (2012): Initial stadium construction
​
Phase 2 (2020): Improvement projects & expansion including new practice fields
Services:
Demolition, site concrete, shotcrete, lineal concrete, flatwork and CMU plus the addition of player statues
Highlights:
​
Phase 1:
​
-
The team poured 178,000 square feet of architectural concrete flatwork and 3,200 lineal feet of site poured-in-place and shotcrete walls.
-
We also poured 120,000 square feet of architectural concrete in a mere four weeks to finish up the job.
Phase 2:
-
Successfully and unobtrusively performed the scope of work at an actively functioning stadium
-
The team worked around the team’s schedule while getting the job done safely and invisibly
-
Accommodated design changes while being proactively flexible for the general contractor
-
Working quickly and off-hours, the job was finished on time and on budget
“Working around a fully functional NFL headquarters with training schedules and games required near-invisible off-hours and weekend work. Everything was always kept immaculate. Aside from the work getting done, no one could tell we were ever there.”
— Matt Maes, Project Executive, Joseph J. Albanese, Inc.
Solar4America
San Jose, California
​
Project: Major expansion of the San Jose ice facility
Services:
​
Demolition, grading, paving, structural and site concrete
Highlights:
-
Perfectly set and poured hundreds of anchor bolts for the structural steel
-
Delivered absolutely flat concrete surfaces, a must for ice rinks
-
Supplied ever-adapting flexibility to meet the needs of the general contractor
-
Provided project efficiency and management using PlanGrid
​
“At Solar4America’s expansion, we hit the location, projection and height of all of the anchor bolts, a very impressive feat. You only get one shot to do that, and we did it right.”
— Matt Maes, Project Executive, Joseph J. Albanese, Inc.