Lawson Lane Bridge

Joseph J Albanese Inc., Dog Logo

Building an Architecturally Appealing and Functional Pedestrian Bridge 

Working closely with the design team and project owner, the Joseph J. Albanese, Inc. team built a Box and Girder pedestrian bridge to connect the buildings across a busy street at the Service Now campus. 

Project Photos

Adam Dobrowolski

“Drawing on our experience and close working relationship with the bridge designers, our team built an extraordinarily beautiful and functional pedestrian bridge at the Service Now campus.”

— Adam Dobrowolski, Project Manager, Joseph J. Albanese, Inc.

At Joseph J. Albanese, Inc., we are committed to getting the job done safely with relentless and deliberate execution. Our team is devoted to bringing the highest level of quality to every project we do for our clients.

Lawson Lane Bridge, Service Now Campus
Santa Clara, California 

Client: Sobrato

Services: 

 

  • Functioned as the general contractor on this project, overseeing most of the construction 

  • Performed multi-scope capabilities, including Grading & Paving, Structural Concrete, Site Concrete, Shotcrete and Bridge Construction (including falsework)

  • Delivered Virtual Construction services, including BIM Modeling 

  • Managed scheduling, invoicing, coordination and sequencing of scopes

  • Managed tiered subcontractors, including drilling, reinforcement, post tension, scaffolding, metalwork, aluminum composite panels, drywall and hoisting

  • Oversaw drillers who provided piles, which are big rods that function as anchors for the foundation to keep the bridge steady


Highlights:

 

  • Built a Box and Girder pedestrian bridge to connect buildings at the Service Now campus

  • Worked closely with Arc Tech, the designer of the bridge, to bring to life the pattern of light decorating the bridge at night

  • Utilized shotcrete with a white cement mix to ensure that the bridge matches the existing building facade

  • Ensured the safety of the workers, pedestrians and drivers by securing the construction area while maintaining traffic and pedestrian access on an active road

 